| Exam 210-065 | Question id=3110 | Endpoint Configuration |
An engineer is deploying a Cisco TelePresence Touch 8 controller for a Cisco TelePresence SX20. Which two steps are required as part of this process?
| A. |
Connect the cable from the Touch 8 controller to the Cisco TelePresence SX20. | |
| B. |
Connect the Touch 8 controller to the power adapter and connect the adapter to the network. | |
| C. |
Connect the Touch 8 controller to the secondary network adapter on the Cisco TelePresence SX20. | |
| D. |
Reboot the Cisco TelePresence SX20. | |
| E. |
Hold the mute button down for 20 seconds while you power on the Touch 8 controller. |