Exam 210-065 Question id=3110 Endpoint Configuration

An engineer is deploying a Cisco TelePresence Touch 8 controller for a Cisco TelePresence SX20. Which two steps are required as part of this process?

A. Connect the cable from the Touch 8 controller to the Cisco TelePresence SX20.
B. Connect the Touch 8 controller to the power adapter and connect the adapter to the network.
C. Connect the Touch 8 controller to the secondary network adapter on the Cisco TelePresence SX20.
D. Reboot the Cisco TelePresence SX20.
E. Hold the mute button down for 20 seconds while you power on the Touch 8 controller.

WARNING

the answers are mixed, do not specify in the comment number or the letter of the answer
please write answer#A instead A, answer#B instead B...
Subject:

only logged users can write comments