Sign Up
Log In
Home
discussion
Exam 200-355 Question id=2117 Implementing a Wireless Network

Refer to the exhibit.

The wireless engineer has deployed the Cisco 5508 Wireless Controller. The controller is responding on the service port; however, it will not respond on the management interface. Which configuration revision will fix the management interface?

A. On the switch interface, configure switch(config-if)#switchport trunk allowed vlan add 10.
B. On the WLC management interface, disable LAG on the management network.
C. On the switch interface, configure switch(config-if)#switchport trunk allowed vlan 10.
D. On the WLC management interface, change the VLAN ID to 20.
E. On the switch interface, configure no spanning-tree portfast trunk.
F. On WLC Controller > General, disable LAG and reboot.