Exam 200-155 Question id=4747 Network Virtualization

An engineer is deploying a Cisco Nexus 1000v into VMWare vSphere using the OVA fie. The engineer deployed the VSM virtual machine in vCenter and completed the initial setup script of the VSM. Which two additional configuration steps are needed to implement the 100GV?

A. Configure an SVS connection to vCenter in the console of the 1000V.
B. Add hosts to the distributed virtual switch in vCenter.
C. Add hosts to the distributed virtual switch in the console of the 1000V.
D. Add the 1000v as a virtual distributed switch in vCenter.
E. Configure an SVS connection to vCenter using the vCenter wizard.

WARNING

the answers are mixed, do not specify in the comment number or the letter of the answer
please write answer#A instead A, answer#B instead B...
Subject:

only logged users can write comments