Exam 200-120 | Question id=100 | Troubleshooting |
The output of the show frame-relay pvc command shows "PVC STATUS = INACTIVE".
What does this mean?
A. |
The PVC is configured correctly and is operating normally, but no data packets have been detected for more than five minutes. | |
B. |
The PVC is configured correctly, is operating normally, and is no longer actively seeking the address of the remote router. | |
C. |
The PVC is configured correctly, is operating normally, and is waiting for interesting traffic to trigger a call to the remote router. | |
D. |
The PVC is configured correctly on the local switch, but there is a problem on the remote end of the PVC. | |
E. |
The PVC is not configured on the local switch. |
There are 4 statuses of PVC:
ACTIVE: the PVC is operational and can transmit data .
INACTIVE: the connection from the local router to the switch is working, but the connection to the remote router is not available.
DELETED: the PVC is not present and no LMI information is being received from the Frame Relay switch.
STATIC: the Local Management Interface (LMI) mechanism on the interface is disabled.