Exam 300-320 Question id=2798 WANs for Enterprise Networks

Refer to the exhibit.
q225
An engineer must provide a redesign for the distribution and access layers of the network. Which correction allows for a more efficient design?

A. Change the link between Distribution Switch A and Distribution Switch B to be a routed link.
B. Reconfigure the Distribution Switch A to become the HSRP Active.
C. Create an EtherChannel link between Distribution Switch A and Distribution Switch B.
D. Add a link between Access Switch A and Access Switch B.

WARNING

the answers are mixed, do not specify in the comment number or the letter of the answer
please write answer#A instead A, answer#B instead B...
Subject:

only logged users can write comments