| Exam 300-320 | Question id=2739 | Advanced Enterprise Campus Networks |
An engineer must design a Cisco VSS-based configuration within a customer campus network. The two VSS switches are provisioned for the campus distribution layer and each one has a single supervisor and multiple 10 gigabit line cards. Which option is the primary reason to avoid plugging both VSL links into the supervisor ports?
| A. |
QoS is required on the VSL links. | |
| B. |
Limited bandwidth is available for VSS convergence. | |
| C. |
The design lacks optimal hardware diversity. | |
| D. |
The implementation creates a loop |