| Exam 300-320 | Question id=2706 | Enterprise Data Center Integration |
Which option is correct when using Virtual Switching System to combine two physical switches into one logical switch?
| A. |
Both control planes forward traffic simultaneously. | |
| B. |
Only one control plane is active, while the other control plane is in standby | |
| C. |
Only one data plane forwards traffic, while the other data plane is in standby. | |
| D. |
Control planes are combined into one virtual control plane. |